While the construction claim can be
used for securing new business, negotiation, and arbitration, the chief purpose
is to recover damages. Damage amount and existence is the claimant’s
responsibility.
Just proving the entitlement or
existence does not help to recover the claim. You can only recover breach of
contract damages when they represent the actual loss. Due to the inherent
implications of construction claims, it is not possible to calculate the precise
amount.
For this purpose, analysts apply
different techniques. A detailed damage analysis can help reduce the award
amount.
If you are looking for help in
calculations of construction damage claims, choose a highly qualified quantum expert to get the job done for you efficiently. Read on for the best
methods for examining construction claim damages:
Methods to Examine Construction Claim Damages
Construction damages are of two
types: general and consequential damages. General damages come from the direct
delay event. On the other hand, consequential damages cannot be predicted
directly. Here are some of the techniques to analyze general construction
claims:
Total Cost Method
In this technique, the total cost
incurred (including profit and overhead) minus the contract price is calculated
to examine the total damages.
Although, it is quite
straightforward, but there is a significant loophole in it. It gives the
contractor complete freedom to include any price they wish to add in the claim
amount.
Estimated Cost Technique
In the estimated cost method, experts
only take out the estimates of the amounts of all damages. These estimates are
based on the rates mentioned in the bill of quantities. If an item is not mentioned
in the bill, then the amount is taken from the rate analysis by the contractor.
When the damage causes are taken out
using the estimate cost method, the final amount can be taken using the actual
cost technique.
Modified Cost Technique
Modified cost method is an improved
form of the total cost technique. In this, the contractor subtracts the extra
costs that come from errors – like the bid error, default of contract or his
fault. Sometimes, analysts use modified and the total cost technique both for
calculating construction damages.
Actual Cost Method
Contractors have complete cost
records with them. In this technique, the analysts use the actual cost records
for damage calculation. Each cost of material, total workforce hours, and each
equipment price is added to get the total amount of damages.
For actual cost calculation, one
needs to have an efficient accounting system to produce detailed and precise
cost records. Therefore, it is always an excellent idea to hire a professional quantum
expert to get accurate results – and prevent risks and errors.
Moreover, to validate the actual
costs, analysts frequently refer to the contract bills and invoices. So
preserve all these records until the settlement of your claim.
Conclusion
There are four techniques to
calculate construction claim damages including the actual cost method, the
total cost method, estimated cost technique, and modified technique.
For 100 percent error-free results, consider
taking expert services. Professional quantum analysts can reassure the
authenticity and accuracy of your damage claim.